This is a very long process, that is being a bit overly
documented.
 |
WELL HERE'S THE FIRST PICTURE OF THE START Of OUR NEW DOJO.
It will be 25 x 30 Mat. changing rooms, full facilities, and no
more scraped toes from cement block walls....lol
|
 |
The Contractor that is making the Dream affordable
|
 |
The work is slow, the contractors help is unqualified (me), but it sure
is going together nicely!
|
 |
Still going...8-22-06..And a long way to go... |
 |
Completed Cross Bracing and Leveled!! |
 |
The floor is completed ready for the walls to be framed up and Raised....
before we continue...ITS PLAY TIME!!!! |
 |
The First two Walls are UP!!!!
|
 |
All the walls are up!! and the doors are framed up.
|
 |
The Roof Trusses were a Bear to build and definately a booger to put up
|
 |
Its definately Tall.. should be more than enough room with 12' clearance
after the spring floor is installed.
|
 |
Russel Helping with the roof!!!
Getting the sheathing tight....
|
 |
Sheathing looks great from the bottom..Man its nice to finally have a
roof over our heads....lol.. |
 |
Sheathing done Tar paper on..
Shingles yet to go..
|
 |
Umm ya notice whos doing the roof if it leaks right?...lol.. No you are
doing a really good job guys!!
|
 |
Half Done... Time to start the siding, Instead of watching you guys
work.
|
 |
Ok now it looks like some mad progress!!! Have to do the routering on
the trim for covering the seam yet.. but It really feels good to accomplish
these tasks!
|
 |
Jurgen, and Dan Closing in the roof gables. Soon we will be water
tight and can start on the spring floor!!
|
 |
Well we actually have the doors done and trimmed out now but its too
dark to take the pic.. I will post it lower.
|
 |
With the rest done on the outside it was time to finish the roof
trusses. I did this last as I wanted to tie them into the walls since the
building is so tall. Big winds dont scare me now.. you will also notice that
every second truss has a hurricane load strap on it.. overkill I know but
lots of fun to install...lol
|
 |
Im just so proud of them I had to show em at a different angle.. notice
that only half the trusses are done. Soon as this side is completed I can
take the beam down...(gotta figure out what to do with that 4x4 I have to
use it somewhere....)
|
 |
Well in the pic it doesnt look as big...but the 6' Ladder next to
the wall should help with size determination...Lol.. Its a 16' Long wall 8'
Tall 22' away from the camera
(Dont ask Why I have so many cardboard boxes on top please).
And its under construction.. no hard times about the stuff on the floor
or you can carry the water and chop the wood...lol
|
 |
8' Deep changing room with an 8' Storage/supply room in back...
(till I get the plumbing permit..)
|
 |
cant resist another photo to overly document the progress
|
 |
Here's the new header installed in compliance with what needed to be, as
well as the new cripple board installed. |
 |
All you have to do is open the door...
(And till its done you still have to work, NO PLAY Yet!...lol...)
|
 |
Chalk Lining the Plywood two boards at a time...
note the height of completed ones behind Jake.
|
 |
AHHH.. Busted Caught with the masks off...
|
 |
Heres the back wall and part of the side with the insulation up..
you can See the amount of spring boards that are done now...
|
 |
The front wall is completed, the fuse panel is completely done now too!! |
 |
The insulation on a Wall complete and Little Dan back out of the foam (
he fell inside the roll..LOL...) |
 |
Well there's a ton of construction mess all around it but the door
to the changing room is finally up now! Just have to trim up the top with
some plywood.
|
 |
The offending header was removed and Here's the Cavalry in to help chisel
away at the door frame to fit in the new header... |
 |
Here's the spring floor side shot..
Halfway put together.
A big thanks to Jim at the Denver Dojo for sharing his floor plans
with me.
It was extremely helpful to have it right there in print in front
of me the whole time. |
 |
The ceiling going up and the side Light cover being installed!! |
 |
The Mat trim being laid down by Rob during his Mid Tour Leave. |
 |
The Mat being laid down and then Taped together... |
 |
The Vinyl Tatami installed all thats left is to re-stretch it after it
relaxes overnight.
(no install pics were shot due to the graphic hand gestures being
made as it was being stretched out...LOL.. what a booger this was to
accomplish) |
 |
The Path to every good training place is set in stone by the teacher. All
you have to do is trustingly walk that path. |
 |
One
down one to go..... |
 |
The Freshly Painted Dojo.. Thanks Guys/Gals... It doesn't Seem so Big now..
Hard to Believe there is a 30ft Mat in there |
 |
The "Recuperation Device"
I really Appreciate everyone that
helped me with this...
|
|